Arlington StreetPrint Case Study

 

Description:

Value: £1,200,000
Duration: 52 weeks
Quantity Surveyor: Synergy
Architect: Short and Associates

Working for Millers Mutual, we completed the office extension / conversion project at 21 Arlington Street.

The work comprised the conversion of existing vaults beneath the forecourt of the office block, into additional office space. 

The floor of the vaults was excavated to provide adequate head room within the new areas and the layout was re-configured by the introduction of new Lunette Vault Brickwork to accommodate the new office space,  with new M&E services going in.   A new Portland Stone spiral staircase was constructed from the underground vaults to street level, requiring a piled reinforced  structure additional to create a new circular stairwell at the front of the existing vaults.
The construction site at Arlington Street is located adjacent to The Ritz Hotel.   The main offices have remained occupied throughout works, with the only access / egress for the office workers being across the operational site, requiring the provision of safe walkways throughout works. 

The construction site at Arlington Street is located adjacent to The Ritz Hotel.   The main offices remained occupied throughout works, with the only access / egress for the office workers being across the operational site, requiring the provision of safe walkways throughout works. 